LB3000

  • ModelLB3000
  • Rated Capacity240t/h
  • Cycle Time45s
Request a Quote
  • LB3000 batch mix asphalt plant with asphalt tank
  • 5 aggregate bins on asphalt mixing plant
  • aggregate dryer drum with stain resistance surface
  • batch mixing tower of LB3000 asphalt plant
  • asphalt tank for batch mix asphalt mixing plant
  • dust collector on LB3000 asphalt plant
  1. ModelLB3000
  2. Rated Capacity240t/h
  3. Cycle Time45s
  4. Aggregate Bins5×10mᶟ
  5. Default Burner TypeOil Burner
  6. Fuel Consumption5.5-7kg/t
  7. Drying Drum SizeΦ2.6×9.5m
  8. Screen Layers5/6
  9. Aggregate Scale Allowance±0.5%
  10. Filler Scale Allowance±0.25%
  11. Bitumen Scale Allowance±0.25%
  12. Mixer Capacity3000kg
  13. Dust Filter Area917m²
  14. New Filler Silo1×45mᶟ
  15. Recycled Filler Silo1×25mᶟ
  16. Filler Storage Hopper1.8mᶟ
Model
Rated Capacity
Cycle Time
Aggregate Bins
Default Burner Type
Fuel Consumption
Drying Drum Size
Screen Layers
Aggregate Scale Allowance
Filler Scale Allowance
Bitumen Scale Allowance
Mixer Capacity
Dust Filter Area
New Filler Silo
Recycled Filler Silo
Filler Storage Hopper
Bitumen Tank
Thermal Oil Heater
Control Room Size
Operation Model
Installed Power
Installed Size (LWH)
Delivery Time
40t/h
45s
4×6.5mᶟ
Oil Burner
5.5-7kg/t
Φ1.2×5.2m
4
±0.5%
±0.25%
±0.25%
500kg
230m²
1×15mᶟ
1×12.5mᶟ
0.4mᶟ
1×30mᶟ
100000kcal
3×2.2×2.5m
3 Modes
132.3kW
-m
15-25Day
50-60t/h
45s
4×6.5mᶟ
Oil Burner
5.5-7kg/t
Φ1.2×5.2m
4
±0.5%
±0.25%
±0.25%
700kg
230m²
1×15mᶟ
1×12.5mᶟ
0.4mᶟ
1×30mᶟ
100000kcal
3×2.2×2.5m
3 Modes
144.6kW
35×18×12m
15-25Day
60t/h
45s
4×6.5mᶟ
Oil Burner
5.5-7kg/t
Φ1.2×5.2m
4
±0.5%
±0.25%
±0.25%
750kg
270m²
1×15mᶟ
1×12.5mᶟ
0.4mᶟ
1×40mᶟ
200000kcal
3×2.2×2.5m
3 Modes
151kW
37×18×14m
15-30Day
90t/h
45s
4×6.5mᶟ
Oil Burner
5.5-7kg/t
Φ1.5×6.5m
4
±0.5%
±0.25%
±0.25%
1100kg
410m²
1×22mᶟ
1×12.5mᶟ
1.8mᶟ
1×40mᶟ
300000kcal
3×2.2×2.5m
3 Modes
232.07kW
37×34×14m
15-30Day
105t/h
45s
4×6.5mᶟ
Oil Burner
5.5-7kg/t
Φ1.8×8.0m
4
±0.5%
±0.25%
±0.25%
1250kg
410m²
1×22mᶟ
1×12.5mᶟ
1.8mᶟ
1×40mᶟ
300000kcal
3×2.2×2.5m
3 Modes
261.57kW
37×34×14m
15-30Day
125t/h
45s
4×8mᶟ
Oil Burner
5.5-7kg/t
Φ1.8×8.0m
4/5
±0.5%
±0.25%
±0.25%
1250kg
450m²
25mᶟ
15mᶟ
1.8mᶟ
2×40mᶟ
400000kcal
4×2.2×2.5m
3 Modes
352.69kW
35×31×15m
20-30Day
175t/h
45s
5×8mᶟ
Oil Burner
5.5-7kg/t
Φ2.2×9.0m
4/5
±0.5%
±0.25%
±0.25%
2200kg
560m²
1×45mᶟ
1×25mᶟ
1.8mᶟ
3×40mᶟ
500000kcal
4×2.2×2.5m
3 Modes
471.02kW
37×32×15m
25-35Day
200t/h
45s
5×8mᶟ
Oil Burner
5.5-7kg/t
Φ2.6×9.5m
5
±0.5%
±0.25%
±0.25%
2500kg
620m²
1×45mᶟ
1×25mᶟ
1.8mᶟ
3×40mᶟ
500000kcal
4×2.2×2.5m
3 Modes
565.39kW
40×34×18m
25-35Day
240t/h
45s
5×10mᶟ
Oil Burner
5.5-7kg/t
Φ2.6×9.5m
5/6
±0.5%
±0.25%
±0.25%
3000kg
917m²
1×45mᶟ
1×25mᶟ
1.8mᶟ
2×40mᶟ
750000kcal
7×2.2×2.5m
3 Modes
656.72kW
42×30×18m
25-40Day
320t/h
45s
6×15mᶟ
Oil Burner
5.5-7kg/t
Φ2.8×12.0m
6
±0.5%
±0.25%
±0.25%
4000kg
1200m²
1×50mᶟ
1×30mᶟ
1.8mᶟ
2×40mᶟ
1000000kcal
7×2.2×2.5m
3 Modes
891.1kW
48×40×19m
30-50Day

Product Details

Company Information

Our asphalt mixing plant manufacturing factory located in Nanyang, where is one of the famous construction machinery Industrial clusters, and biggest road construction machinery base. We have rich experience on both home and abroad projects, more than 500 sets asphalt mixing plant have been exported to 21+ countries, like Indonesia, Malaysia, Sri Lanka, Saudi Arabic, Algeria, Nigeria, Russia, Kazakhstan, Uzbekistan. Our factory is located between Wuhan and Zhengzhou, where just takes 1.5 hour by high-speed train from both, or 3 hours from Beijing, Shanghai, Guangzhou by plane.

With rapid spreading of our sales to around the world, we keep to improve our management level and production process to meet international standard. And we have been certificated by ISO9001, CE and PCT.

We made best shipping plan for customers. With so many years’ experiences exporting to all around world, Daynn knows deeply the importance of packing and shipping, we know how to ensure your goods safe and how to reduce delivery time, we make most economic shipping plan for you.

Contact